Services
Environmental Impact Assessment
|
The National Environmental Policy Act (NEPA) and similar
state laws, such as the California Environmental Quality Act
(CEQA), require comprehensive, interdisciplinary analyses
of proposed projects' environmental impacts in support of
public decision-making. Aspen Environmental Group is highly
qualified in this area, having conducted environmental impact
assessments for many large and complex infrastructure and
energy projects as well as small industrial and commercial
facilities.
Services and Capabilities
- Strong project management, utilizing recognized experts
to address each issue of concern
- Project teams that provide appropriate environmental and
engineering expertise
- Comprehensive knowledge of NEPA and CEQA requirements
and other federal and state laws
- Presentations of technical information to agency decision
makers and the public
- Focused literature and field research to determine baseline
conditions
- State-of-the-art methodologies and tools for impact assessment
- Practical and effective project alternatives, mitigation
measures, and mitigation monitoring plans
- Demonstrated capabilities in public participation and
community involvement.
Selected Project Experience
Transmission Lines
Sunrise Powerlink Project
Tehachapi Renewable Transmission Project EIR/EIS.
TANC Transmission Project
SCE Devers-Palo Verde No. 2 500 kV Project EIR/EIS
SCE Antelope-Pardee Sections 1, 2 and 3
Jefferson-Martin 230 kV Transmission Project EIR
Sunset Substation and Transmission and Distribution Project CEQA Documentation
Los Banos-Gates 500 kV Transmission Project EIR and SEIR
Tri-Valley 2002 Capacity Increase Project EIR
Alturas Transmission Line EIS/R
SDG&E Miguel-Mission 230 kV #2 Project EIR
Northeast San Jose Transmission Reinforcement Project EIR
Power Generation
Application for Certification Review, California Energy Commission
Divestiture of PG&E's Hydroelectric Assets
Cabrillo Port LNG Deepwater Port Project EIR/S Review
Diablo Canyon Power Plant Steam Generator Replacement Project EIR
City of Long Beach LNG Import Project EIR/S Review
Pipelines, Oil & Gas
Yellowstone Pipeline Reroute Project EIS
Kinder Morgan Concord-to-Sacramento Pipeline EIR
Pacific Pipeline EIR and EIS/SEIR
Program EIR - Division of Oil, Gas and Geothermal Resources (DOGGR)
Kinder Morgan Carson-to-Norwalk Pipeline EIR
Water Supply
Bolsa Chica Water Transmission Line and Wastewater Service Project SEIR
Tehachapi East Afterbay Project
EIR
Flood Control
Whitewater River Basin (Thousand Palms) Flood Control Project EIS/EIR
Prado Basin, Reach 9, and Norco Bluffs Final SEIS/EIR
San Luis Rey River Flood Control Project Operation and Maintenance SEIS/EIR
Educational Institutions
LAUSD New School Construction Program EIR
Valley New High School No. 1 at Cal State University Northridge EIR
Canoga Park New Elementary School IS/MND
Military Facilities
Joint Red Flag Air Defense Artillery Exercise 2005 and 2006
Vandenberg AFB Environmental Support for San Antonio Creek
Environmental Assessment of Additional Airspace Restrictions, National Training Center, Ft. Irwin, California
Traffic Study for National Training Center, Ft. Irwin, California
OTHER EXAMPLES:
Combined Array for Research in Millimeter-wave Astronomy Relocation Project EIS/EIR
Littlerock Reservoir Sediment Removal Project EIR/EIS
Gaviota Interim Marine Terminal SEIR/S
Molino Gas Project EIR
Level 3 Communications Infrastructure Project
FDA Laboratory EIS/EIR
Matilija Dam Ecosystem Restoration Project EIS/EIR
EIR on Part B Permit for EWI Hazardous Waste Facility
Los Angeles County Drainage Area Improvement Project Environmental
Assessments
Rio Salado Environmental Restoration Project EIS
Matilija Dam Ecosystem Restoration
Monterey Accelerated Research System (MARS) Cabled Observatory Project EIR/EIS
|
|
|
|