Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services Environmental Impact Assessment
Project Type: Energy

Sunset Substation and Transmission and Distribution Project CEQA Documentation

The City of Banning proposes to construct the Sunset Substation and supporting 33 kV transmission line that would interconnect with the City's existing distribution system. The purpose of this new substation and transmission is to relieve the existing overloads that are occurring within the City's electric system and to accommodate projected growth in the City. Aspen serves as the Environmental Project Management Team for the CEQA documentation being prepared for the City's Utility Department. Currently, an Initial Study is being prepared to determine the type of CEQA document needed (i.e., Negative Declaration [ND], Mitigated Negative Declaration [MND], or Environmental Impact Report [EIR]).

This project is located on the following Services pages:
Environmental Impact Assessment

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED