Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services Environmental Impact Assessment
Project Type: Energy

SDG&E Miguel-Mission 230 kV #2 Project EIR

Aspen prepared an EIR for a proposed 230 kV circuit between the Miguel and Mission substations in San Diego County. The new 35-mile 230 kV circuit was installed on existing towers, and existing 69 kV & 138 kV circuits were relocated to 80 new steel poles.

This project is located on the following Services pages:
Environmental Impact Assessment
Power Generation and Energy Infrastructure
Services Provided on this Project:
• Environmental Impact Analysis
• Project Description and Alternatives
• Transmission Planning
• EMF/Engineering
• Land Use and Recreation
• Visual Resources
• Socio and Public Services
• Cultural
• Biological Resources
• Geology
• Contamination and Groundwater
• Soils
• Hydrology
• Air Quality
• Noise
• Transportation

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED