Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services Power Generation and Energy Infrastructure
Project Type: Energy

SDG&E Miguel-Mission 230 kV #2 Project EIR

Aspen prepared an EIR for a proposed 230 kV circuit within an existing transmission line right of way (ROW) between Miguel (near Chula Vista) and Mission substations (Mission Valley) in San Diego County. The project included installing a new 230 kV circuit on existing towers along the 35-mile long ROW, as well as relocating 69 kV and 138 kV circuits on 80 new steel pole structures. In addition, Miguel Substation and Mission Substation was modified to accommodate the new 230 kV transmission circuit. The Draft EIR was issued on April 1, 2004, and the public comment period ended on May 17, 2004. The Final EIR was released in June 2004 and construction is complete.

This project is located on the following Services pages:
Environmental Impact Assessment
Power Generation and Energy Infrastructure
Services Provided on this Project:
• Environmental Impact Analysis
• Project Description and Alternatives
• Transmission Planning
• EMF/Engineering
• Land Use and Recreation
• Visual Resources
• Socio and Public Services
• Cultural
• Biological Resources
• Geology
• Contamination and Groundwater
• Soils
• Hydrology
• Air Quality
• Noise
• Transportation

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED