SCE Devers-Palo Verde 500 kV No. 2 Transmission Line Project EIS/EIR (DPV2)
Under contract to the California Public Utilities Commission (CPUC) and also under the direction of the United
States Department of the Interior, Bureau of Land Management (BLM), Aspen has completed a Draft EIR/EIS for
SCE's proposed DPV2 Project which includes La Paz and Maricopa Counties, AZ; and San Bernardino and Riverside
Counties, CA. Aspen prepared the air quality sections for the Draft EIR/EIS. This effort included the
estimate of worst-case daily construction activities (i.e. construction activity overlap) and construction
emissions within each of the four separate local air quality jurisdictions covered by the project route,
determination of appropriate significance criteria for the project, and estimation of annual emissions and
general conformity issue identification for each of the three nonattainment air basins covered by the project.
Additionally, the emission estimate from the applicants Preliminary Environmental Assessment (PEA) was corrected
to use current regulatory accepted emission factors and emission factor calculation methodologies; to
include all project related import and export truck traffic and helicopter emissions; to include
proper unpaved access road lengths for the remote tower construction sites; and also included the recommendation
of all appropriate air quality mitigation measures.
|