Project Type: Surface Water Drainage

Prado Basin, Reach 9, and Norco Bluffs Final SEIS/EIR

Aspen prepared the Final Supplemental EIS and EIR for the Prado Basin, Reach 9, and Norco Bluffs components of the Santa Ana River Mainstem Project in Orange, Riverside, and San Bernardino Counties. This project was unique in that Aspen conducted a GIS-based analysis of releases from Prado Dam under three different flood event scenarios. In the analysis, water levels downstream of the dam were delineated for different outflows from the dam outlet structure to indicate areas where riparian vegetation in the river channel would be affected. Engineering modeling of flow velocities in the downstream channel were also displayed to indicate areas where high flow velocities could damage vegetation.

This project is located on the following Services pages:
Environmental Impact Assessment
Mitigation Monitoring, Compliance, and Reporting
Biological Surveys and Impact Assessment
Habitat Restoration
Air Quality Permitting and Modeling
Water-related Compliance & Permitting
Services Provided on this Project:
• Environmental Impact Assessment
• Permitting
• Mitigation Monitoring
• Biological Surveys and Impact Assessment

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED