Project Type: Surface Water Drainage
Prado Basin, Reach 9, and Norco Bluffs SEIS/EIR (U.S. Army Corps of Engineers)
Under contract to the U.S. Army Corps of Engineers, Aspen prepared the Final
Supplemental EIS and EIR for the project, which examined the impacts of stabilizing
erosion at Norco Bluffs. In addition to the SEIS/EIR, Aspen prepared the 404(b)(1)
evaluation for the Corps and the Streambed Alteration Agreement for Orange County.
|