Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services   Air Quality Permitting and Modeling
Project Type: Surface Water Drainage

Prado Basin, Reach 9, and Norco Bluffs Final SEIS/EIR

Aspen prepared the Final Supplemental EIS and Project EIR for the Prado Basin, Reach 9, and Norco Bluffs components of the Santa Ana Mainstem Project. The SEIS/EIR examined the impacts associated with stabilizing erosion at Norco Bluffs, changes in inundation levels behind the dam, increased release volumes from Prado Dam under new operations, and bank stabilization downstream (Reach 9) from the dam. Aspen prepared the Final SEIS/EIR, including a new air quality analysis, and prepared a revised General Conformity analysis.



This project is located on the following Services pages:
Environmental Impact Assessment
Mitigation Monitoring, Compliance, and Reporting
Biological Surveys and Impact Assessment
Habitat Restoration
Air Quality Permitting and Modeling
Water-related Compliance & Permitting
Services Provided on this Project:
• Environmental Impact Assessment
• Permitting
• Mitigation Monitoring
• Biological Surveys and Impact Assessment

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED