| |
|
Services
Environmental Impact Assessment
|
Project Type: Energy
Bolsa Chica Water Transmission Line and Wastewater Service Project SEIR
Aspen prepared a Supplemental EIR for a proposed 6.7-mile water transmission line
in Orange County, California.
|
|
|
Services Provided on this Project:
• Environmental Impact Analysis
• Air Quality Studies
• Biological Studies and Surveys
• Cultural Resources
• Environmental Contamination
• Geology/Soils
• Hydrology/Hydraulic Analysis
• Water Resources
• Land Use and Recreation
• Noise Studies
• Public Participation
• Traffic and Transportation
|
|
|