SDG&E Sunrise Powerlink Transmission Project

SDG&E Sunrise Powerlink Transmission Project EIR/EIS. Under contract to the CPUC, and under a Memo-randum of Understanding with BLM, Aspen is preparing an EIR/EIS for a highly controversial 150-mile trans-mission line from Imperial County to coastal San Diego County to deliver renewable and low-cost power. Aspen coordinated transmission planning and engineering alternatives as part of the environmental review and provided discussion of net greenhouse gas emissions for multiple generation and transmission scenarios. The 500 kV line would pass through Anza-Borrego Desert State Park, and a 230 kV line would continue through rural San Diego County with both overhead and underground segments.



This project is located on the following Services pages:
Environmental Impact Assessment
Power Generation and Energy Infrastructure
Air Quality Permitting and Modeling
Public Participation and Community Involvement
Water-related Compliance & Permitting
Services Provided on this Project:
• Environmental Impact Analysis
• Economic Evaluation
• CEQA Strategy
• Operational and Economic Analysis
• GIS
• Electrical System Modeling
• Forestry
• Fisheries and Aquatic Biology
• Agriculture
• Land Use
• Hydrologic/Hydraulic Analysis

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED