Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services Hydrologic and Hydraulic Modeling and Sediment Transport Studies
Project Type: Habitat Restoration

Wood Canyon Ecosystem Restoration Project DPR/EA, CA

Aspen prepared a DPR on behalf of the Corps for environmental restoration of Wood Canyon in Orange County, CA. The project involved hydraulic modeling of the Wood Canyon floodplain, and hydraulic design of restoration features for tributary flow entering Wood Canyon.



This project is located on the following Services pages:
Habitat Restoration
Hydrologic and Hydraulic Modeling and Sediment Transport Studies
Services Provided on this Project:
• Environmental Impact Analysis
• Hydrologic/Hydraulic Analysis
• Environmental Planning
• Wetlands Assessment
• Incremental Cost Analysis

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED