Aspen Environmental Group Logo  
Aspen Environmental Group  


  Back to Home  
  Back to Services  


  Project Website Links  

   
Services   Air Quality Permitting and Modeling
Project Type: Habitat Restoration

Murrieta Creek Flood Control Project (Murrieta Creek Air Quality Conformity)

As part of an intensive effort to finalize Feasibility Studies and EISs for inclusion in the Water Resources Development Act 2000, Aspen assisted the Corps in revising problematic air quality and water quality analyses prepared by another contractor. Aspen developed new construction assumptions and re-calculated air pollutant emission from construction activities to demonstrate that the proposed Murrieta Creek Flood Control Project would conform to federal de minimis thresholds, thereby avoiding a serious obstacle for the project.



This project is located on the following Services pages:
Mitigation Monitoring, Compliance, and Reporting
Biological Surveys and Impact Assessment
Habitat Restoration
Air Quality Permitting and Modeling
Services Provided on this Project:
• Air Quality Studies
• Environmental Impact Analysis
• Biological Resource Assessment
• Habitat Restoration
• Mitigation Monitoring, Compliance & Reporting

TOP :: BACK

© 2010 ASPEN ENVIRONMENTAL GROUP ALL RIGHTS RESERVED